The Old Rectory, Wimbledon Village
The Old Rectory, Wimbledon Village
Project Summary
LSS were appointed to build a two story Reinforced Concrete frame including part-basement to form a new sports complex linking into an existing historic dwelling in central Wimbledon village.
This was a challenging project due to restricted site access and required a sensitive build approach considering the site location and proximity to surrounding neighbours.
Our experienced management and site team worked closely with main contractor to ensure a delicate construction plan was in place at all times throughout the works.
Read more...
Location
Wimbledon Village
Duration
32 Weeks
Cost
Negotiated
![old-rec-1b](https://londonss.co.uk/wp-content/uploads/2020/02/old-rec-1b-800x800.jpg)
![old-rec-2b](https://londonss.co.uk/wp-content/uploads/2020/02/old-rec-2b-800x800.jpg)
![old-rec-3b](https://londonss.co.uk/wp-content/uploads/2020/02/old-rec-3b-800x800.jpg)
![old-rec-4b](https://londonss.co.uk/wp-content/uploads/2020/02/old-rec-4b-800x800.jpg)
![old-rec-5b](https://londonss.co.uk/wp-content/uploads/2020/02/old-rec-5b-800x800.jpg)
![old-rec-6b](https://londonss.co.uk/wp-content/uploads/2020/02/old-rec-6b-800x909.jpg)
![old-rec-8b](https://londonss.co.uk/wp-content/uploads/2020/02/old-rec-8b-800x515.jpg)
![old-rec-9b](https://londonss.co.uk/wp-content/uploads/2020/02/old-rec-9b-800x1114.jpg)
![old-rec-7b](https://londonss.co.uk/wp-content/uploads/2020/02/old-rec-7b-800x800.jpg)